Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, on-Site Installation. |
Warranty: | 5 Years |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hard, fast rolling shutter door | |
Material | Material: Aluminum alloy profile (with or without PU sandwich) |
TThickness: double-layer aluminum strip PU sandwich, plate thickness 0.8mm; double-layer aluminum without PU sandwich, plate thickness 1.2 mm; |
|
Panel thickness: 40mm, surface anodized organic coloring treatment | |
Wind resistance | 35m/s |
Velocity | 1-2.5m/s, adjustable |
Pigment | White / grey / Silver / Blue / Red / Customer custom |
Mode of operation | Remote control, wall switch, magnet control, radar, pull rope switch, signal light |
Noise level | ≤ 60 dB |
Lift way | Turbine / 90 ˚ vertical lift / elliptical type |
Safety performance | Infrared photoelectric sensor, airbag edge protection |
Maximum dimensions | 5000*7500mm |
Actuating device | servo motor (220V 50Hz / 380 V 50Hz,1.1Kw,1.5Kw,2.2Kw) |
Navar | Frequter + PLC or servo |
Seal | Seal of guide rail, middle seal of door panel, top seal of door body, bottom seal of door body |
Wind resistance | Grade 5-8 (Befourt scale) |
End buffer function | End buffer technology can effectively protect the rigid damage of the reducer and operation mechanism and prolong the service life of the door |
Place of production | Shanghai, China (mainland China) |
Production cycle | 40-50 days in high season, 30-40 days in low season. |
Various ways to improve are available
Installation measurement method
Q: How can I find the exact price?
A:Please provide the exact size and number of doors you need.
We usually quote within 24 hours of receiving your inquiry (excluding weekends and holidays).
If you are very anxious to get a price, please send us an e-mail or otherwise contact us so that we can provide you with a quote.
Q: How do you ensure the quality of your sales?
A: For quality control, we have four testing procedures: initial, sampling, re-inspection and final inspection.
Q: What is your delivery date?
A: It depends. Usually, it takes 40-50 days after the deposit is received and all details are confirmed.
Q: What is the mode of transportation?
A:It can be transported by sea and air. Please check with us before placing your order.
Q: What are your payment terms for official trade?
A: Normally, T/T 30% deposit to start production and the balance before shipment.
Q: How do you enable our business to build long-term relationships?
A:1. We maintain good quality and competitive price to ensure our customers' interests.
2. We respect every customer as our friend, we sincerely do business and make friends with them, no matter where they come fro