Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, on-Site Installation. |
Warranty: | 5 Years |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PVC Quick rolling shutter door | |
Door curtain | Material: PVC \ polyester fiber cloth, thickness of 1.0mm |
Tensile strength: 4000N / 5CM; tear strength: 600N; peel strength: 90N / 5CM | |
Color: a variety of colors are optional, customizable | |
Lead rail | Material: galvanized steel / aluminum alloy / SU 304, thickness: 2.0-2.5mm |
Rice noodle design on the inner and outer surface of the guide rail | |
Width: 55mm-100mm | |
Box cover | Material: Galvanized steel / aluminum alloy / SU 304 |
Plate thickness: 1.0mm-2.0mm | |
Open the door speed | 0.8-0.3m/s, adjustable |
Closing velocity | 0.8-0.3m/s, adjustable |
Mode of operation | Remote control, wall switch, magnet control, radar, pull rope switch, signal light |
Safety performance | Infrared photoelectric sensor, airbag edge protection |
Navar | The control system is controlled by PLC and frequency converter, with precise control, soft start and soft stop; with "on", ",", "," stop "and" emergency stop " buttons; multiple limit switch sensors, accurately and safely control the operation limit. |
Actuating device | Servo special external hanging motor |
Source | 220V-380V |
Wind resistance | 38m/s |
Gas tightness | Grade 2, and EN12426 |
Seal | Bottom, side, and top seal |
Safe | Safe photoelectric sensor |
Proximity transducer | |
Accident and fall prevention safety system |
Q: How can I find the exact price?
A:Please provide the exact size and number of doors you need.
We usually quote within 24 hours of receiving your inquiry (excluding weekends and holidays).
If you are very anxious to get a price, please send us an e-mail or otherwise contact us so that we can provide you with a quote.
Q: How do you ensure the quality of your sales?
A: For quality control, we have four testing procedures: initial, sampling, re-inspection and final inspection.
Q: What is your delivery date?
A: It depends. Usually, it takes 40-50 days after the deposit is received and all details are confirmed.
Q: What is the mode of transportation?
A:It can be transported by sea and air. Please check with us before placing your order.
Q: What are your payment terms for official trade?
A: Normally, T/T 30% deposit to start production and the balance before shipment.
Q: How do you enable our business to build long-term relationships?
A:1. We maintain good quality and competitive price to ensure our customers' interests.
2. We respect every customer as our friend, we sincerely do business and make friends with them, no matter where they come from.